Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Voltage (AC) | 380V three-phase four-wire system | Equipment Size(MM) | cleaning room:850*900*1750 DPF machine:800*800*1050 |
Maximum Power (KW) |
12.8 | Equipment Weight (KG) | 368 |
Liquid Temperature (ºC) |
55-60 | Safety Warning | The chassis ground wire shelf must be reliably connected to the ground. |
Gas Tank Capacity (L) |
25 | Tank Pressure (KG) | 8 |
Kingkar DPF Cleaning Machine | Other machines |
|
Feature | The high-pressure air in the high-pressure gas storage tank is released instantaneously. Using the top water of the air, the compressed water is generated to generate potential energy, and the blockage inside the honeycomb carrier is pushed out instantly. Simply, it is water flushing and high pressure purging alternate work. | Only using water or air purging or burning it.need to move the filter from one work-top to another work-top. |
Difference | 1. Can total Removal of oil residuals, PM10, cerium residuals. 2. Cleaning different types of particulate filters and catalyst efficiently(SCR and DOC) 3.Safety for all the filters. 4.Preservations of the noble metals of the DPF. 5. Processing water always clean because of an efficient filtration system: no need to change the water. | 1.At most clean DPF 70% using water.because the blockage is insoluble in water. 2.Lower efficiency on the very dirty filter(oil)and big-sized filters 3.Risk of damaging the filter due to the high temperature by heating and burning. 4.High water consumption |
Work time | Cleaning time only 60 mins. | 3-24hours |
Cost | Only 1 set of machine enough. |
2 or 3 or 4 machines. |